Heavy rain brought high water but work continued. Matthew, John and Ian start weaving in the lengths of willow. The lengths were woven into place and pressed down to the river bed using the technigue of standing on them. There's our post driver bottom left.

Hand tools! We took a very gentle approach to the river banks to avoid unnecessary disturbance. Machinery would have done too much damage and destabilised the banks.