Spiling on the River Aire
Labels
binding
bridge
diagram
erosion
habitat restoration
invasives
life
monitoring
planting
river fly
roots
spiling
threat
tools
willow
Sunday, 21 October 2018
21st October 2018 A year on
Nearly a year on from planting.
The planting and new bank shape have survived flood and severe drought. The leaves are ready to drop and during low water, we will be able to inspect the stream side.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)