After the two storms, Ciara and Dennis during which the level of the Aire rose to 2.62 and then 2.26, logs and other large debris were washed onto the spiling. The willow growth seems to have been flattened but has stopped the debris' progress towards the bridge. To add to that, there is no visible scouring and although it has clearly taken some huge forces, the 50m of basketwork reamins intact and secure. Awesome.
Showing posts with label bridge. Show all posts
Showing posts with label bridge. Show all posts
Wednesday, 19 February 2020
Saturday, 16 December 2017
Site plan
2015 December bridge threatened
14th December 2015 at BD16 1LT . Standing on the Millennium Way looking towards the Bailey bridge you can see how an eroding scoop on the river bank is progressing downstream. That's the way meanders travel! It's threatening the bridge pier. The bank is vertical and relatively soft compacted silt.
Subscribe to:
Posts (Atom)


